PKP SELURUH NEGARA ? haa pishangggggg bersama-sama lah kita nampaknya !
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
JUM JADI SUPPORTERS !
February Stars Goal : 8684 / 100,000
Road To 70K Followers :
60,455 / 70,000
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
Supporters: 60/65
Yattohyatt Family
https://www.facebook.com/becomesupporter/102523248029866
同時也有7部Youtube影片,追蹤數超過2,600的網紅Beast Runners 跑山獸,也在其Youtube影片中提到,FORMOSA TRAIL 福爾摩沙古 main loop with my wife Eva Lobo. This course is maintained by Petr Novotny and @Beast Runners 跑山獸 since 2015 for Formosa Trail tra...
「concrete road」的推薦目錄:
concrete road 在 Facebook 的最佳解答
Salam terawih, ada sinar sinar bintang berkelipan ke dimalam ramadhan yg ke sepuluh ni? ehh yeke dah sepuluh hari puasa ?
JUM JADI SUPPORTERS !
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
February Stars Goal : 48,705 / 100,000
Road To 70K Followers :
60,33 / 70,000
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
Supporters: 54/60
Yattohyatt Family
https://www.facebook.com/becomesupporter/102523248029866
concrete road 在 柬埔寨房地產投資 Facebook 的精選貼文
Total of large projects to open in 2020
December 28, 2020
Although the Covid-19 Crisis has had many negative social and economic effects, the Cambodian government has continued to fulfill its responsibilities, especially in infrastructure development. To date, no infrastructure projects have been postponed, and projects to open in 2020 have already begun. Here are some of the big projects that will open in 2020:
1) Rehabilitation and construction project of National Road No. 2 and No. 22
The rehabilitation and construction of National Road No. 2 and No. 22 with a total length of more than 72 km at a cost of approximately $ 56 million, which is financed by the Government of the Republic of Korea with the contribution of the Royal Government of Cambodia.
The groundbreaking ceremony was held in the presence of Prime Minister Hun Sen and HE Park Heung-kyung, Ambassador of the Republic of Korea to Cambodia on the morning of February 11, 2020.
The section of National Road No. 2 is from Takhmao roundabout to O Chambok with a length of 62.56 km (passing through Phnom Penh with a length of 5.4 km, Kandal with a length of 14.21 km and Takeo with a length of 52.56 km). Separately, National Road No. 22 is from O Chambok to Ang Ta Som with a length of 9.61 km in Takeo province. (Read more )
As of December 2020, the project has achieved about 20% and is scheduled to be completed in the first quarter of 2022. (Read more )
2) National Road 10 from Battambang to Koh Kong
National Road No. 10 connects Samlot, Battambang province, through Veal Veng, Osom, Pursat province to Koh Kong province, with a total length of more than 198 kilometers, which will cost a total of more than 188 million US dollars, financed by the Chinese government.
The groundbreaking ceremony was held on the morning of March 9, 2020 under the high presidency of Prime Minister Hun Sen and Chinese Ambassador HE Wang Wentian.
The road will be built in accordance with the level 3 road standard of the technical standard of the People's Republic of China, with a total width of 9 meters, 8 meters wide double-layer pavement (DBST), which will take 48 months to build from December. 2019 to December 2023.
As of August 2020, this project has achieved about 36%.
3) AEON 3 Shopping Mall on Street 60m
The AEON 3 shopping mall project is located in Prek Talong 3 village, Chak Angre Krom commune, Meanchey district, built with an investment capital of approximately 290 million US dollars. The project is larger than the first and second Aeon Markets combined, with a total floor area of 174,000 square meters.
The groundbreaking ceremony was held this morning, October 7, in the presence of HE Khuong Sreng, Governor of Phnom Penh, as well as representatives of the Japanese company AEON MALL (CAMBODIA) CO., LTD.
AEON 3 is scheduled to open in 2023.
4) The first cable bridge in Phnom Penh connecting Koh Pich to Koh Nora
Two large bridges worth more than 40 million US dollars, built by OCIC, opened the construction site on the morning of October 26 under the presidency of Samdech Techo Prime Minister Hun Sen.
The first bridge is a cable-stayed concrete bridge connecting Koh Nora Development Area to Koh Pich Satellite City, 824 meters long and 24.5 meters wide, with 4 lanes for cars and 2 lanes for motorcycles. The bridge is expected to cost $ 38 million and will take about 35 months to build.
The second bridge is a 60-meter-long, 21-meter-wide and 21-meter-wide bridge with two rainbow-shaped steel bridges connecting National Road No. 1 to the Koh Nora Development Zone. The bridge is expected to cost $ 1.6 million and take about 12 months to build.
The two bridges are part of a $ 2.5 billion OCIC project to develop Koh Nora into a new satellite city.
5) 38 roads in Siem Reap
The project has 38 infrastructure roads in Siem Reap, with a total length of 108.74 km, under construction with a total national budget of about 140 million US dollars. The project will take 13 months to complete and is expected to be completed by the end of 2021.
The project was opened under the presidency of Prime Minister Hun Sen on the morning of November 30.
6) Small and medium enterprise group worth $ 30 million of Sear Rithy in Takhmao
World Bridge Industrial Developments Co., Ltd.'s 4.0 small and medium enterprise cluster project worth more than $ 30 million Currently under construction on more than 6 hectares along National Road 21 near the affordable housing project in Takhmao.
The groundbreaking ceremony was held on the morning of November 27 under the chairmanship of His Excellency Cham Prasidh, Minister of Industry, Science and Technology, and Mr. Sear Rithy, Chairman of the Board of Directors of the World Bridge Group and other distinguished guests.
The project is scheduled to be completed by the end of April 2021.
concrete road 在 Beast Runners 跑山獸 Youtube 的最佳解答
FORMOSA TRAIL 福爾摩沙古
main loop with my wife Eva Lobo. This course is maintained by Petr Novotny and @Beast Runners 跑山獸 since 2015 for Formosa Trail trail running event. This main circle is 22km long with significant elevation gain of 1700m. Average trail runner need 6 hours as we did, however average hiker should count with 10 hours.
This course is mid-altitude mountains on east from Puli 埔里. Course is beautiful with pleasant forest and several views. Even during hot summer day temperature in this forest is nice. All course is single track with several challenging parts, last 6km are downhill on concrete road.
Formosa Trail 福爾摩沙古
event is held every year last weekend of November and runners participate in 16, 40, 75 and 104km with start in Solas Hotel 天泉溫泉水 on Liyutan lake 鯉魚潭. Formosa Trail is very popular trail running event among overseas runners from Japan and Hong Kong.
If you go explore never forget to have GPS (with uploaded GPX) and all equipment and food and water for whole day.
Map (can download GPX): https://en.mapy.cz/s/jarobazazu
Course descripton:
青山橋 (600m)
板仔寮 1380m
舊武界越山 1668m
武界越山主峰1524m
武界越山南峰 1575m
獅凸魯山 1587m
武界山 1500m
additional mountains nearby:
界越山 1507m
橫屏山西峰 1442m
Formosa Trail: http://www.formosatrail.com/
Beast Runners 跑山獸 : https://beast.run/shop
#跑山獸
#beastrunners
#formosatrail
Music from Uppbeat (free for Creators!):
https://uppbeat.io/t/torus/tonic
License code: DUTO6D1RTPCSQTNN
concrete road 在 Linora Low Youtube 的最讚貼文
Subscribe to my channel : http://youtube.com/linoralow
Bit of a throwback video to the earlier part os 2021. This was my first time ever going to Glamz at Genting which is a popular instagrammable spot just before Genting.
I had a fabulous time with my peeps from @Koafitnessmy and it was a great time to just get away from the concrete lifestyle. It was only a night but I definitely would come back for a longer period to stay.
Find out more about Glamz here : https://glamz.com.my/stay-with-us
Join my KOA tribe for workout sessions here: https://koafitnessmy.com/
You can find me here
Website: http://www.linoralow.com
Facebook:http://facebook.com/linoralow
Instagram: http://instagram.com/linoralow
Twitter: http://twitter.com/linoralow
Tiktok: http://tiktok.com/@linoralow
concrete road 在 Beixin & Robin Youtube 的最佳解答
With travel temporarily halted, we decided to explore the hidden gems within Singapore. Join us as we explore the local nature attractions nestled within the Southern Ridges, avoiding the hustle and bustle of the concrete jungle that is metropolitan Singapore.
Our hike begins at the break of dawn at Henderson Waves, an award-winning architectural work of art designed by RSP Architects Planners & Engineers (Pte) Ltd and IJP Corporation Ltd, UK. The tallest pedestrian bridge in Singapore, Henderson Waves stands 36 meters above Henderson Road and spans a length of 274 meters. Next, we venture to the peak of Mount Faber Park and look out to stunning views of Singapore's heartlands. Then, we explore the myriad of pink bougainvillea flowers at Terrace Garden, a popular spot in Telok Blangah Hill Park. Finally, we end the day at Forest Walk and its incredible secondary forest.
May our videos be a form of escapism and source of zen for you, and encourage you to appreciate the little, simple things in life. Even in these turbulent times, there is still much beauty in this world if we keep our hearts and minds open.
Cheers!
Timecodes
0:00 - Intro
1:23 - Henderson Waves
3:54 - Mount Faber Park
5:18 - Mount Faber Hillstop Scenic View
6:39 - Stream Garden
7:38 - Terrace Garden
9:10 - Forest Walk
11:29 - Behind The Scenes
---------
x Connect with Us
Instagram - https://instagram.com/beixinandrobin
Beixin's Instagram - https://instagram.com/beixin
Robin's Instagram - https://instagram.com/robinlamhj
Facebook - http://www.facebook.com/beixinandrobin
x Gear List:
Main Camera - Canon EOS R6
Main Lens - Canon RF 28-70mm f2
Tele Lens - Canon RF 70-200mm f2.8
Mic - Rode Videomic Pro NTG
Drone - DJI Mavic 2 Pro
x Music
Artlist - https://artlist.io/Robin-58878
(Get 2 months free)
x Software
Adobe Premiere Pro
Contact us at beixinandrobin@gmail.com
concrete road 在 Concrete Road - YouTube 的推薦與評價
... <看更多>